Ifj Pan Contribution To The Ess: Radio Frequency Distribution System, Power Converters Installation And Cryomodule Tests
SUPERCONDUCTIVITY AND PARTICLE ACCELERATORS 2018(2019)
摘要
The European Spallation Source (ESS) is currently under installation phase. It requires involvement of highly specialized engineering teams, working together in order to install all necessary equipment and to commission the facility. The engineering team from IFJ PAN is contributing to this common effort at Lund and team of twenty engineers and technicians are working at ESS site. The team is involved in three main tasks: installation of Radio Frequency Distribution System, Cryomodule tests and installation of Power Converters.
更多查看译文
关键词
European Spallation Source,Radio Frequency,RFDS,cryomodule,power converters
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要