Progress in Design and Testing of the DAQ and Data-Flow Control for the Phase-2 Upgrade of the CMS Experiment

IEEE transactions on nuclear science(2023)

引用 0|浏览35
暂无评分
摘要
The second phase of the LHC, the high-luminosity LHC (HL-LHC), is scheduled to start in 2029, after a shutdown during which the beam intensity and focusing will be significantly upgraded. For this HL-LHC era, also the CMS detector will receive an extensive upgrade, primarily to maintain its physics performance at increasing pileup. The Phase-2 CMS Level-1 trigger rate will increase to 750 kHz, for an estimated data rate in excess of 50 Tbit/s. The Phase-2 CMS off-detector electronics will be based on the ATCA standard, with back-end boards receiving the detector data from the on-detector front-ends via custom, radiation-tolerant, optical links. The CMS Phase-2 data acquisition design tightens the integration between trigger control and data flow, extending the synchronous regime of the DAQ system. At the core of the design is the DAQ and Timing Hub, a custom ATCA hub card forming the bridge between the different, detector-specific, control, and readout electronics and the common timing, trigger, and control systems. The overall synchronization and data flow of the experiment are handled by the Trigger and Timing Control and Distribution System (TCDS). For increased flexibility during commissioning and calibration runs, the design of the Phase-2 trigger and timing distribution system breaks with the traditional distribution tree, in favor of a configurable network connecting multiple independent control units to all off-detector endpoints. In order to reduce the number of custom hardware designs required, the DAQ hardware is designed, such that it can also be used to implement the TCDS.
更多
查看译文
关键词
ATCA,control,DAQ,data acquisition,distribution,timing,trigger
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要